A mobile air hangar was installed for Moscow Refinery reconstruction in July 2021. The customer was the Rizzani de Eccher international company. The hangar with 700 m² usable floor space accommodated a workshop for steel structures painting with anticorrosive and flame retardant compositions. An autonomous oil-fired heating system installed to maintain the required temperature. The set-point temperature allows to accelerate significantly the structures painting process. In accordance with fire safety standards, the hangar was equipped with explosion-proof lighting and ventilation systems. The project implementation period was 3 weeks.

Need a pre-fabricated room?
Consult us!

Reinforced PVC to withstand extreme heat, cold or snow
Quick deployment without a building permit
Lightweight and compact for fast delivery
Simple and easy to move structure with quick installation
The UPS provides operation of the facility in case of shutdown of the regular network
Monitoring system informs about power outage, wind amplification, etc.