How is carried out installation of an inflatable hangar?

How is carried out installation of an inflatable hangar?

Everyone knows how to build framed structures – it is necessary to hire special equipment and large
team of specialists, because the building must be built in strict accordance with the design.
And how is carried out installation of an inflatable hangar?
In short: easy and fast!
Installation of inflatable hangars is carried out on a marked site without foundation, lifting mechanisms
and special equipment.
All parts of the pneumo-framed hangar, as well as fasteners, are individually labeled excluding incorrect
assembly. Installation of pneumatic structures excludes both high-rise and welding works as well.
We offer customers three options for installation of a pneumo-hangar:
1) Our team of specialists installs pneumo-hangar on turnkey basis in any place of the world;
2) Our specialist conducts installation supervision advising your construction crew;
3) Unaided installation according to detailed instructions. The instructions are presented both in text
and in the form of video material, where details are shown on how to assemble a pneumo-hangar.
If you have any questions, our service department employees are ready to help and advise you anytime

Need a pre-fabricated room?
Consult us!

Reinforced PVC to withstand extreme heat, cold or snow
Quick deployment without a building permit
Lightweight and compact for fast delivery
Simple and easy to move structure with quick installation
The UPS provides operation of the facility in case of shutdown of the regular network
Monitoring system informs about power outage, wind amplification, etc.