Solution
А pre-fabricated warehouse was installed at the construction site of the Amur GPP for storing equipment шn December 2020,. The manufacture, delivery and installation of the hangar was carried out in record time. The customer received the finished object in just 1.5 months. The pneumohangar is equipped with a 9x9m cargo gate, heating, ventilation and lighting systems. The new warehouse made it possible to organize storage of equipment at the construction site for the needs of MT Russia LLC (a subsidiary of Maire Tecnimont Group)