Snow and frost impede construction? There is a solution!

Snow and frost impede construction? There is a solution!

Cold weather often causes delay beyond the contractual completion date. In addition, there are regular additional costs due to the increased need for electricity and labour hours. We offer a turnkey solution.

A pneumoangar can be installed directly above the construction site. It reliably protects against precipitation and sub-zero temperatures, thus significantly reducing downtimes.

By the way, for protection from bad weather pneumoangars were installed at construction of the famous new Kuznetsovsky Tunnel. A Lovat-RME-375SE Tunnel-Boring Machine with the cutting diameter of 9.5 meters was completely sheltered from heavy snowfall, enabling BTS Tunelling to ensure maximum machine efficiency.

Need a pre-fabricated room?
Consult us!

Reinforced PVC to withstand extreme heat, cold or snow
Quick deployment without a building permit
Lightweight and compact for fast delivery
Simple and easy to move structure with quick installation
The UPS provides operation of the facility in case of shutdown of the regular network
Monitoring system informs about power outage, wind amplification, etc.